Export Metering for Renewables

If you want to export electricity to the grid you will need to either adapt your current Half Hourly meter or install a new one.

WHAT IS AN Export Meter? (Generation Meter)

An export meter records how much energy you export to the grid that you don’t use within your home or business. It will provide precise measurements of how much electricity you export and form the basis for a precise tariff to be paid to you. Export meters are standard for systems over 30kW

Are you about to start generating power on your site? If so, you may need an export meter installed to register the value of exported electricity. Your existing meter may be suitable to operate as an import/export meter, but if not, you will require a new meter. You should make this a priority so you can benefit from your power generation immediately your system is brought into service.

Export Meter installation service.

Our service is focussed on Half Hourly Export Meter Operator solutions (MOP) for systems of 30kW and above. Working closely with your Distribution Network Operator (DNO), we evaluate your system and the capacity of the local grid to absorb your generation. We can manage the whole process on your behalf.

Get a quote for an Export meter.

Setting up export metering – what you will need.

Does all this sound complicated?

Get a Quote for MOP and DC Services.

Export Metering Costs

There are three elements of charges incurred through export metering.